File #: #17-0060    Version: 1 Name:
Type: RESOLUTIONS Status: Consent Calendar
File created: 1/31/2017 In control: City Council
On agenda: 6/5/2017 Final action: 6/6/2017
Title: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN PABLO ACCEPTING WORK PERFORMED BY GHILOTTI BROS., INC. FOR THE 2015/16 PAVEMENT REHABILITATION PROJECT (PAV-016) AND THE NORTH ARLINGTON BOULEVARD ROAD REHABILITATION PROJECT (NAR-EMR) AS COMPLETE AND DIRECTING THAT A NOTICE OF COMPLETION BE PREPARED AND FILED WITH THE COUNTY RECORDER
Attachments: 1. RESO 2017-099 Ghilotti Bros NOC Pavement Rehab PAV-016, 2. Notice of Completion PAV-016
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
PREPARED BY: KEVIN MCCOURT DATE OF MEETING: 06/05/17
SUBJECT:
TITLE
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN PABLO ACCEPTING WORK PERFORMED BY GHILOTTI BROS., INC. FOR THE 2015/16 PAVEMENT REHABILITATION PROJECT (PAV-016) AND THE NORTH ARLINGTON BOULEVARD ROAD REHABILITATION PROJECT (NAR-EMR) AS COMPLETE AND DIRECTING THAT A NOTICE OF COMPLETION BE PREPARED AND FILED WITH THE COUNTY RECORDER

Label
CITY MANAGER RECOMMENDATION
Recommendation
Adopt Resolution

BODY
COMPLIANCE STATEMENTS
CIP 2015-2017
Pavement Rehabilitation Project 2015 and Pavement Rehabilitation Project 2016, Project PAV-016, is an adopted policy item under the FY 2015-17 City Council Priority Workplan, effective October 1, 2016.

CEQA Compliance Statement
The project is categorically exempt under the California Environmental Quality Act. Section 15301 of the CEQA Regulations, Existing Facilities. A Notice of Exemption was filed with the Contra Costa County Clerk on May 26, 2016.

BACKGROUND
The 2015-16 Pavement Rehabilitation Project was combined with the 2016/17 Pavement Rehabilitation Project as part of the City's ongoing pavement maintenance program. The Project was performed at the following locations:

1. John Avenue, Giant Boulevard to 11th Street
2. Broadway Avenue, San Pablo Avenue to Rumrill Boulevard
3. Post Avenue, 17th Street to 19th Street
4. Rumrill Road, Road 20 to Rumrill Boulevard
5. 17th Street, Market Avenue to Emeric Avenue
6. Brookside Drive, Rumrill Boulevard to 23rd Street
7. Palmer Avenue, 11th Street to Larchmont Drive
8. Bush Avenue, Rumrill Boulevard to 17th Street

The work performed included, but was not limited to, base failure repairs, slurry sealing, crack sealing, cold planning of existing asphalt concrete, overlaying existing asphalt concrete pavement with conventional asphalt concrete, constructing concrete curb ramps, placement of striping and installing valley gutter.

An emergency scope of work that was added to the project was the stab...

Click here for full text