File #: 24-242    Version: 1 Name:
Type: RESOLUTIONS Status: Consent Calendar
File created: 6/13/2024 In control: City Council
On agenda: 7/1/2024 Final action:
Title: CONSIDER ADOPTING RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN PABLO (1) APPROVING AND ADOPTING THE PLANS AND SPECIFICATIONS FOR THE CITYWIDE TRASH CAPTURE DEVICE INSTALLATION PROJECT; (2) AWARDING A CONTRACT TO UNITED STORM WATER, INC.; (3) AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH UNITED STORM WATER, INC. IN THE AMOUNT OF $145,558 WITH A 10% CONTINGENCY FOR A TOTAL AUTHORIZATION NOT TO EXCEED $160,114 FOR THE PROJECT; AND (4) APPROPRIATING GENERAL FUND DESIGNATED RESERVED - NPDES MRP COMPLIANCE FACILITIES IMPROVEMENT IN THE AMOUNT OF $100,000 TO THE PROJECT BUDGET CEQA COMPLIANCE STATEMENT The Citywide Trash Capture Device Installation Project was assessed and determined to be Categorically Exempt from environmental review under Section 15301 of the CEQA Regulations. The CEQA Notice of Exemption was filed at the Contra Costa County Clerk's Office on 06/12/2024.
Attachments: 1. Att A - RES Awarding CON United Storm Water Inc 2024-07-01, 2. Att B - AGR CIP 0305-Contractor Signed 06.12.24
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

PREPARED BY:   ITZEL GOMEZ                                          DATE OF MEETING:   07/01/2024

SUBJECT:                     

TITLE

CONSIDER ADOPTING RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN PABLO (1) APPROVING AND ADOPTING THE PLANS AND SPECIFICATIONS FOR THE CITYWIDE TRASH CAPTURE DEVICE INSTALLATION PROJECT; (2) AWARDING A CONTRACT TO UNITED STORM WATER, INC.; (3) AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH UNITED STORM WATER, INC.  IN THE AMOUNT OF $145,558 WITH A 10% CONTINGENCY FOR A TOTAL AUTHORIZATION NOT TO EXCEED $160,114 FOR THE PROJECT; AND (4) APPROPRIATING GENERAL FUND DESIGNATED RESERVED - NPDES MRP COMPLIANCE FACILITIES IMPROVEMENT IN THE AMOUNT OF $100,000 TO THE PROJECT BUDGET

 

CEQA Compliance Statement

The Citywide Trash Capture Device Installation Project was assessed and determined to be Categorically Exempt from environmental review under Section 15301 of the CEQA Regulations. The CEQA Notice of Exemption was filed at the Contra Costa County Clerk’s Office on 06/12/2024.

 

Label

CITY MANAGER RECOMMENDATION

Recommendation

Adopt Resolution

 

Body

Workplan Compliance statement

Major Policy Goal: Build a Healthy Community - 109 Develop Public Facilities for Active Living is an adopted policy item contained in the FY 2023-25 Adopted City Council Priority Workplan, updated May 1, 2023.

 

BACKGROUND

The Citywide Trash Capture Device Installation Project (Project, CIP 0305) is one of the planned measures that aims to comply with provision C.10 of the National Pollutant Discharge Elimination System (NPDES) and fulfill the expectations outlined in the City’s Long Term Trash Management Plan and the NPDES permit.  Provision C.10.a. of the NPDES permit requires the City to implement trash load reduction control actions, including full trash capture systems, “to meet the goal of 100 percent trash reduction or no adverse impact” to the creeks by June 30, 2025.  It involves installing additional full trash capture systems, called Connector Pipe Screen (CPS) devices in specific storm drain inlets throughout the City. 

 

Staff worked with consultants at Brown and Caldwell to develop the Project plans and Technical Specifications.  The Project is broken up into two phases as follows:

 

Phase 1 - Rumrill Blvd Locations: City Staff have identified up to 44 storm drain inlets where CPS devices may need to be installed or repaired along Rumrill Blvd. Per CNRA grant requirements, these devices need to be installed before the closeout of the Rumrill Complete Streets Project grant. The cost to install these devices will be paid from CNRA grant funds for the Rumrill Project. 

 

Phase 2 - Other Citywide Locations: City Staff identified 72 inlets in the City’s right-of-way as feasible for CPS devices based on current inlet and pipe sizing information.

 

On April 11, 2024, the City advertised the Notice Inviting Bids online via Planet Bids. Three addenda were issued during the advertisement period.  On May 23, 2024, the City received one (1) bid and publicly opened bids as follows:

 

 

Contractor/Bidder

Location

Total Base Bid

1)

United Storm Water Inc.

Industry, CA

$145,558.00

 

The apparent lowest responsive and responsible bidder is United Storm Water Inc. from Industry, CA. The bid total is $145,558.00. Staff conducted a bid analysis and found no irregularities. Staff recommends awarding the contract to United Storm Water, Inc.

 

The construction is scheduled to start in July 2024. The first phase of the Project has sixty (60) working days, while the second phase has ninety (90) working days. The Project is expected to be substantially completed by the end of November 2024.

 

For the Project, staff recommends a 10% contingency of $14,556, increasing the total authorization amount to $160,114, which would allow staff to approve small contract change orders in the event that some inlets are unsuitable for the devices and in-field changes are made.

 

A summary of the funding sources and projected expenditures is provided in the fiscal impact section.

 

FISCAL IMPACT

The fiscal impacts are outlined in the tables below.

 

Construction Expenditure

 

Description

Amount

Construction (United Storm Water Inc.)

$145,558

Construction contingency (10%)

$ 14,556

Total:

$160,114

 

Council Action

 

 

Action

From: Account Code

Amount

To: Account Code

Amount

Appropriate

100-0000-49999

$100,000

320-0305-43604-GEN-424

$100,000

 

 

Funds for construction have been appropriated as follows:

Construction Budget

 

Funding Source

Fund/Account Code

Amount

Appropriated

CNRA Grant Funding (Rumrill Project)

320-0700-43604-CNR-217

$37,724

Reso 2021-092

CIP Budget

320-0305-43604-GEN-424

$22,390

FY 24 NPDES Operating Budget Adjustment 06/18/24

FY23 GFDR

320-0305-43604-GEN-424

$100,000

Current Council Request

 Total:

 $160,114

 

 

 

ATTACHMENT

Att A-Resolution

Att B-Contract for Construction executed by United Storm Water, Inc.